Project
|
Content
|
Location
|
|
Centenial Distribution, Contractors Northwest
|
Place and finish interior and exterior slabs and tilt
panels.
|
Hayden, ID
|
|
Huntwood Cabinets, The Haskins Co.
|
Place and finish 450,000 square feet of slab and tilt
panesl using our laser screeds
|
Liberty Lake, WA
|
|
14th & Grand Water Tank, Morse Group
|
Installation of footings and ring wall for the tank base
|
Spokane, WA
|
|
Empire Airlines Hanger
|
Place and laser screed finish of interior slabs
|
Hayden, ID
|
|
EWU Archives
Building, Panco Const.
|
Place and laser screed finish interior slabe
|
Cheney, WA
|
|
Coeur d'Alene High
School,
Panco Construction
|
Place and finish 45,500+ square feet of interior floor
slabs.
|
Coeur d'Alene, ID
|
|
Gateway Plaza
I & II
Polin & Young Construction, Inc.
|
Place and finish 130,000+ square feet of slab utilizing
Somero Laser Screed. Place and finish 60,000 square feet of tilt-up panels.
|
Spokane, WA
|
|
George Gee Dealership,
The Haskins Co.
|
Place and finish 58,660 square feet of interior slabs with
black concrete and apply floor treatments.
|
21502 E. Mission Ave.
Liberty Lake, WA
|
|
Home Depot,
R & O Construction
|
Place and finish 114,350 sq ft of interior slabs, 26,790
sq ft of exterior slabs, 44,365 sq ft of tilt up and 2,000 lf of footings.
|
Coeur d'Alene, ID
|
|
Home Depot,
Citadel Construction
|
Place and finish 145,000 square feet of interior and
exterior slabs utilizing Somero Laser Screed.
|
9116 N. Newport Hwy.
Spokane, WA
|
|
Jackson V
Building,
A & A Construction
|
Installation of footings and walls, shear walls, rock
textured exterior foundation wall, interior salb on grade and slab on decks,
pan stairs and stamped entry.
|
2310 N. Molter Road Liberty
Lake, WA
|
|
Kettleworks,
Inland Building
Systems
|
Set up, place gravel, grade, place and finish 21,000
square feet of slab on grade.
|
Highway 41 Rathdrum, ID
|
|
LDS East Valley,
KOP Construction, Inc.
|
Place and finish 90,000 sq ft of concrete parking lot.
|
21022 E. Wellesly
Otis Orchards, WA
|
|
Petsmart,
Shea Construction
|
Place and finish 26,144 square feet of interior slab and
apply floor treatment.
|
9950 Newport Hwy. Spokane,
WA
|
|
Pinecroft Office
Complex Buildings
I, II, IV, V, VII,
Divcon, Inc.
|
Place and finish 66,000 square feet+ of interior slabs
using our S-160 Laser Screed and 36,000 square feet of tilt-up panels.
|
12410 E. Mirabeau Parkway
Spokane, WA
|
|
Spokane County
Shops,
Associated Construction
|
Place and finish 8,800 square feet of interior slab, and
2,000 square feet of dry shake slab.
|
Empire Avenue Spokane, WA
|
|
Sportsman Warehouse,
Eckman Mitchell Construction, LLC
|
All installation of cast-in-place concrete including:
footings, stem walls, 42,165 square feet of interior floor slab on grade and
slab on deck and 23,000 square feet of exterior sidewalks and loading docks.
|
Spokane Valley Mall Spokane,
WA
|
|
Target,
Walsh Pacific
|
Place and Finish 90,000 square feet of slab on grade using
our S-160 Laser Screed.
|
4065 N. Montana Ave.
Helena, MT
|
|
Wal-Mart,
ESI General Contractors
|
Place and finish 54,000 square feet of interior slab,
install colored stamped vestibule, install exterior sidewalks and garden
area.
|
Pondereay, ID
|
|
Whitworth Water District, System 8 Improvements,
Morse Construction Group, Inc.
|
Installation of concrete ring wall for 3.0 MG Reservoir
Tank.
|
Spokane, WA
|